Welded rail on concrete ties, with fibre in the shoulder that hears every train, every flat wheel and every crack, and wayside units that set every switch.
Each wayside unit powers and reads 80 km of line: fibre interrogators listening 40 km each way, detectors that check every wheel, and the SIL 4 interlocking that sets the switches and sends movement authority by radio. A 30 kWh battery carries it through a grid outage.
A track machine lays ties at 610 mm and threads long rail at about 300 m an hour. Ballast is dropped and tamped up in lifts, the strings are closure-welded at the 35 °C neutral temperature, and the fibre, huts, switch machines and detectors go in before the geometry run and the first trains.
Design targets for the autonomous track system.